Kildare
NUI Maynooth
Heneghan Peng Architects
€20.2 million
292
Works included a new stand-alone energy centre, refuse collection point, associated site works and pitch enabling works. The building site was confined and occurred in a live university campus close to other student residences to the east and mature residential dwellings beyond the northern boundary of the site.