Kildare
NUI Maynooth
Heneghan Peng Architects
£18m
292
Works included a new stand-alone energy centre, refuse collection point, associated site works and pitch enabling works. The building site was confined and occurred in a live university campus close to other student residences to the east and mature residential dwellings beyond the northern boundary of the site.